New Domestic Gas Connection (SNGC LNG) 2025:
New SNGC LNG Gas Connection: Getting a New gas connection at home has always felt like a big challenge for families in Pakistan. Long waiting times, confusing paperwork, and uncertainty about approval made the process stressful. But in 2025, SNGC (Sui Northern Gas Pipelines Limited) has introduced a more transparent and simplified LNG-based domestic connection system to make life easier for households.
Why Choose SNGC LNG Connection in 2025?
- Reliable supply of domestic fuel.
- Faster processing of new applications.
- Online tracking of your application status.
- Affordable connection fees compared to previous years.
- Eco-friendly LNG usage, supporting Pakistan’s energy transition.

Step-by-Step Process for Applying
Here’s how you can apply for a new SNGC LNG gas connection in 2025:
- Get the Application Form – Available at SNGC offices or downloadable online.
- Fill in Required Details – CNIC, property documents, and contact information.
- Attach Supporting Documents – Proof of residence, electricity bill, ownership/tenancy papers.
- Submit the Application – Either at the nearest SNGC office or online portal.
- Pay Initial Charges – As per SNGC’s fee schedule.
- Verification & Inspection – SNGC team visits to verify details.
- Final Approval & Installation – Connection installed after approval.
New Gas Connection Fees 2025 (SNGC LNG)
| Category | Charges (PKR) | Notes |
|---|---|---|
| Application Form | 250 | Available at SNGC offices |
| Processing Fee | 2,000 | Non-refundable |
| Security Deposit | 7,000 | Refundable upon disconnection |
| Service Line Charges | 20,000–25,000 | Based on area & distance |
| Meter Installation | 10,000 | Includes testing & setup |
💡 Total average cost: PKR 40,000–45,000 depending on location.

Latest Updates for 2025
- Online Portal Introduced: Apply and track application status from home.
- Priority for New Housing Schemes: Special allocation for approved societies.
- Faster Timelines: Average waiting time reduced from 2 years to 6–9 months.
- Eco-Friendly Initiative: LNG-based domestic supply aimed at reducing gas shortages.
Final Thoughts
The SNGC LNG Domestic Gas Connection 2025 is a game-changer for families in Pakistan. With clear fees, faster timelines, and an online application system, the process is much smoother than before. If you’ve been waiting for a secure and affordable fuel solution, 2025 is the right time to apply.

FAQs
Q1. How long does it take to get a new SNGC gas connection in 2025?
On average, it takes 6–9 months, depending on area and inspection clearance.
Q2. Can I apply online for an SNGC connection?
Usually due to missing documents, non-ownership proof, or location issues. You can re-apply after correction.
Q3. What if my application is rejected?
Usually due to missing documents, non-ownership proof, or location issues. You can re-apply after correction.
Q4. Is the fee refundable?
Only the security deposit is refundable; processing charges are non-refundable.
Q5. Does SNGC provide LNG connections everywhere?
Mostly in major cities and housing societies; expansion is ongoing in 2025.











